03-June-2004 Mark Sibenac Multibeam AUV testing Configuration: -Multibeam tail -Multibeam mid-body with SSS/SBP -Multibeam nose with cobalt (134=84h) and polymer (56) 07:15 left dock 07:30 switchover from 100base-t to freewave took about 5 minutes. 07:53 deck test mission of Lab1.cfg (2004.155.07) 07:56 7.9% relative humidity in mvc sphere 07:59 killed deck test mission successfully 08:08 deck test mission of launchWithProp.cfg (2004.155.08) with heezen (wireless) 08:10 killed successfully with heezen (wireless) 08:22 raised AUV into LARS with straps 08:28 started launchWithProp.cfg (2004.155.09) with heezen (wireless) 08:29 dropped AUV in water 08:30 mission killed 08:38 started MultiSonarSet.cfg (2004.155.10) three sonar power settings setpoint: heading north for about 18 minutes depth=20m 08:58 vehicle surfaced 09:01 getlogs elevator looks very nice rudder was noisy, but acceptable overall mission success. collected over 1000 sss and sbp data points 09:12 started MultiSonarWay.cfg (2004.155.11) long waypoint mission 09:14 vehicle submerged 09:38 vehicle surfaced collected 2049 sbp records. mission deemed success. control looks okay too. 09:49 started (2004.155.12) 09:51 vehicle submerged 10:46 suface gps get 13:00 recovery 13:03 connected shore tether, and TCP/IP connections switched over gracefully and quickly. 13:20 dave plotted one of the sbp files, and it looks great! success! still needs some work, though. 13:30 dave plotted one of the sss low files, and it looks great! success! still needs some work, though.