BRIEF SUMMARY OF MISSIONS 291.00-04 - Not recorded. These were probably runs on deck. 291.05 - Failed to run due to Ips abort. 291.06 - Aborted by the operator because of failure to dive. - The descent behavior was using pitch control with a 10 Degree setpoint. 291.07 - Aborted by the operator because it failed to dive and a collision with the ice was imminent. - Pitch control; 10 Degrees. 291.08 - Aborted by the operator because of failure to dive. - Pitch control; 15 Degrees. 291.09 - Aborted by the operator because of failure to dive. - Pitch control; 5 Degrees. 291.10 - Aborted by the operator because of failure to dive. - 10 Sec surface run followed by 15 Sec of +10 Deg pitch up. - No ips log. 291.11 - Aborted by the operator because the vehicle was in a patch of ice. 291.12 - The small boat assisted this launch. - Vehicle dove. - The operator issued an acoustic abort, but the vehicle had aborted moments early due to an IPS driver crash. - Comms were lost. - 25 Meters, 3 Min. On Deck: - Drew & crew reballasted the vehicle. - Sib & Hans fixed the comms problem. - Parosci problem ocurred. Drew & crew fixed it. *** Summary of Software Changes: *** * Added code to prevent non-essential sensor from aborting the mission. * Hans? 292.00-05 - Deck runs. 292.06 - Octans driver crash aborted the mission moments after it started. - Operator removed octansServer from devices.cfg. - Crossbow now provides heading. 292.07 - Aborted by the operator because of failure to dive. - Lost comms? 292.08 - The vehicle dove but the depth envelope terminated the mission because of a depth overrun. - Vehicle was 78 Deg bow down. - Long inital surface run. - Launch had -10 Degree pitch control. - 15 Meters, 5 Min. - Ips aborted at 225 sec. - CTD interesting. 292.09 - Out & back. The vehicle dove and the mission was not prematurely terminated. - 20 Meters - No flow measurement on CTD2 - Depth/Pitch control marginal. - There are some Parosci dropouts. - Dvl water layer tracking good. - Kearfott position estimate reasonable. 292.10 - 7 Minute out & back. Mission ran to completion. - Depth/Pitch control marginal. - Ips died at 225 Seconds. - Dvl water layer tracking giving reasonable results. - Kearfott position estimate reasonable. - There are some Parosci dropouts. - Battery low. 296.09 - First attempted buoy launch. Straight, then circle for 15 min, at 50 meters. 296.10 - Unreachable waypoint test; 10 min, 30 meters 296.11 - Unreachable waypoint test; 14 min, 25 meters ** Open water deep sections near Svalbard ** 297.03 - Yoyo to 500 m 297.04 - Yoyo to 500 m 297.05 - Yoyo to 500 m ** Under Ice Triangle Runs ** 298.00 - 1350 meter triangle partially under ice, Ips active, 30 meters 298.03 - 1350 meter triangle partially under ice, Ips active, 30 meters 298.05 - 1350 meter triangle partially under ice, Ips active, 30 meters 298.06 - 500m North, 2500m @ 120, 2400m @ 250, yoyos to 50 m.