reset Resetting... ---------------------------------------------------------------- Persistor CF21M SN 02294 PicoDOS V2.28r3 PBM V2.27 (C) 1998-2003 Persistor Instruments Inc. - www.persistor.com ---------------------------------------------------------------- C:\>dir Volume in drive C is NONAME Volume Serial Number is 0CD6-61CB Directory of C:\ DEPLOY.DAT 102 04-19-04 3:29p APR2004 04-19-04 2:23p 1 file(s) 102 bytes 1 dir(s) 511,836,160 bytes free C:\>decd APR2004 \APR2004 C:\APR2004\>dir Volume in drive C is NONAME Volume Serial Number is 0CD6-61CB Directory of C:\APR2004\ . 04-19-04 2:23p .. 04-19-04 2:23p 4083E088.DAT 3,584 04-19-04 2:23p 4083E2FE.DAT 3,584 04-19-04 2:33p 4083E3D0.DAT 3,584 04-19-04 2:36p 4083E484.DAT 3,584 04-19-04 2:39p 4083E5EC.DAT 3,584 04-19-04 2:45p 4083E934.DAT 35,328 04-19-04 3:07p 6 file(s) 53,248 bytes 2 dir(s) 511,836,160 bytes free C:\APR2004\>dlel *.* All files in directory will be deleted! Are you sure (Y/N) ? Y C:\APR2004\>cd .. C:\>rmdir APR2004 C:\>dir Volume in drive C is NONAME Volume Serial Number is 0CD6-61CB Directory of C:\ DEPLOY.DAT 102 04-19-04 3:29p 1 file(s) 102 bytes 0 dir(s) 511,926,272 bytes free C:\>del *.* All files in directory will be deleted! Are you sure (Y/N) ? Y C:\>dir Volume in drive C is NONAME Volume Serial Number is 0CD6-61CB Directory of C:\ 0 file(s) 0 bytes 0 dir(s) 511,934,464 bytes free C:\>G boota app Next: => A - Program at E40000 PBM>res Resetting... deploy.dat does not exist. Continuing with deployment with default schedule. This can be modified by hitting Ctrl-X below and entering menu Hit Ctrl-X within 3 seconds to enter set-up 3..2.. Enter M to Enter Main Menu 1) Set Date and Time 2) File Actions 3) Set Deploy Parameters 4) Calibrate Accelerometers 5) Verify and Deploy 6) Data Offload 7) Exit to PicoDos 8) Sleep Enter Selection: ? 1 Current date and time: Tue Apr 20 12:23:15 2004 Reset date and time? [N] ? y Enter Date: [04/20/2004] ? 04/21/2004 Enter Time: [12:23:17] ? 19:24:00 Current date and time: Wed Apr 21 19:24:00 2004 Current date and time: Wed Apr 21 19:24:01 2004 Current date and time: Wed Apr 21 19:24:03 2004 Current date and time: Wed Apr 21 19:24:04 2004 Current date and time: Wed Apr 21 19:24:05 2004 Is time Correct? [Y] ? 1) Set Date and Time 2) File Actions 3) Set Deploy Parameters 4) Calibrate Accelerometers 5) Verify and Deploy 6) Data Offload 7) Exit to PicoDos 8) Sleep Enter Selection: ? 4 Calibrate Accelerometers selected Position axis 1 to positive one g (point upwards) Hit space bar when positioned TCR1 Clock = 160000 Hz positive g on time = 8427 counts Position axis 1 to negative one g (point downwards) Hit space bar when positioned negative g on time = 5097 counts period length = 14477 counts Calibration of axis 1 complete bias = 8.69489 offset = -4.06126 Position axis 2 to positive one g (point upwards) Hit space bar when positioned TCR1 Clock = 160000 Hz positive g on time = 5803 counts Position axis 2 to negative one g (point downwards) Hit space bar when positioned negative g on time = 8984 counts period length = 14083 counts Calibration of axis 2 complete bias = -8.85445 offset = 4.64854 Position axis 3 to positive one g (point upwards) Hit space bar when positioned TCR1 Clock = 160000 Hz positive g on time = 5152 counts Position axis 3 to negative one g (point downwards) Hit space bar when positioned negative g on time = 8551 counts period length = 14487 counts Calibration of axis 3 complete bias = -8.52427 offset = 4.03148 1) Set Date and Time 2) File Actions 3) Set Deploy Parameters 4) Calibrate Accelerometers 5) Verify and Deploy 6) Data Offload 7) Exit to PicoDos 8) Sleep Enter Selection: ? 3 Set Deploy Parameters selected <--------------------Sample Period-------------------> ___________________ _____ | | | | | | | | | __| |_________________________________| <--Sample Duration--> Enter sample period (seconds): [3600] ? Enter sample duration (seconds): [600] ? 900 Enter measurement frequency (Hz): [10] ? Enter date and time to take first measurement Enter Date: [04/21/2004] ? Enter Time: [20:25:23] ? 20:00:00 Enter date and time to take final measurement Enter Date: [04/21/2005] ? Enter Time: [20:00:00] ? Sample Period = 3600 seconds Sample Duration = 900 seconds Measurement Frequency = 10 Hz The first measurements will be made at Wed Apr 21 20:00:00 2004 The last measurements will be made at Thu Apr 21 20:00:00 2005 Is this correct? [Y] ? 1) Set Date and Time 2) File Actions 3) Set Deploy Parameters 4) Calibrate Accelerometers 5) Verify and Deploy 6) Data Offload 7) Exit to PicoDos 8) Sleep Enter Selection: ? 5 Verify and Deploy selected using 51ms Timer Actual Measurement Frequency = 9.803922 Hz Actual Sample Duration = 904.127991 Seconds Memory Requirements per Sample = 53248 bytes Is this correct? [Y] ? Storing setup in deploy.dat Sleeping until Wed Apr 21 20:00:00 2004