Nov 8, 2011 10:00 - Deployed @ 3647.7 X 121 53.5 Wind East @ 5kts. Nov 8, 2011 14:30 - Downloaded data files @ 36 47.59 X 121 51.48 wind west at 10 knts Nov 8, 2011 15:30 - Changed scale to 0.6, fudge at 0.5 Nov 8, 2011 15:45 - Under tow. Nov 8, 2011 17:25 - Release Tow and Resistance set to 100 Ohms. Nov 8, 2011 17:30 - Resistance set to open circuit Nov 8, 2011 17:32 - V/I table set. Scale = 0.5 fudge at 0.5 Nov 9. 2011 11:30 - Started Various Load Testing (Times are Buoy Time (UTC) 19:30-19:50 -> Open Circuit 19:50-12:10 -> 100 Ohms 20:10-20:30 -> 75 Ohms 20:30-20:50 -> 50 Ohms 20:50-21:10 -> 25 Ohms at 12:11, foul-up with the logger. The PTO controller stopped responding so I had to stop logging and cycle power to that it came back up and I restarted to logger. Data seems to now be continuing to appended to D000029... in R000003 Nov 9, 2011 1:45: Waves gone. SYstem power cycled (from on/off swith on buoy). scale = .4 fudge = .5. Data now accumulating in R00000 Going in. Nov 10, 2011 11:00 - Buoy under tow and charging battery. Batteries reading 23.5 after diodes before charging Nov 10, 2011 12:45 - Off tow and off charger. Batteries reading 25.1V Nov 10, 2011 1:00 - Load program started. NOv 11, 2011 ~3:00 - Buoy Recovered. Nov 11, 2011 16:50 - Logging application stopped.