(All times west coast times) - Deployed Tuesday June 26, about 8:30AM. Cyclyed power around 9:00, resulting in R00001 being created in data file. - Installed Solar panels Friday around 10:30AM. Cycled power as part of this procedure, resulting i R00002 and R00003. - Changed "Scale Factor" to 0.6 from 0.8 at 2:22PM saturday, June 30 due to very calm conditions. This was done right at the very end of D000025 in R00003. D000026 begins with new scale factor in place. - July 1, 9:50PM. Changed "Scale Factor back to 0.8 due to increasing waves. This occurred roughly in the middle of D000057_120701_212218. - July 2, 10:04AM. Changed "scale factor" to 0.7. This occurred roughly 3/4 of the way through D000069.. in R00003. - July 8, 7:55PM. Changed scale factor to 0.2 for 15 minutes due to stuck piston. This occurred roughly half way through D000223 in R00003. - July 8, 8:12PM. Changed scale factor back to 0.7. R00000: contains 4 data files R00001: contains 72 data files R00002: contains 2 data files R00003: contains 245 data files Total: 323 data files