| Name | Last modified | Size | Description | |
|---|---|---|---|---|
| Parent Directory | - | |||
| 6x6x3-Hinged.pdf | 2017-06-02 09:25 | 206K | ||
| 6x6x3-Impact.pdf | 2017-06-02 09:26 | 391K | ||
| PTO_ReplacementJunction_BOM.pdf | 2017-06-02 13:34 | 23K | ||
| PTO_ReplacementJunction_BOM.xlsx | 2017-06-02 14:30 | 13K | ||
| PowerBuoy_10_PTO Replacement.pdf | 2017-06-02 09:29 | 34K | ||
| Quote_1706016_from_Ocean_Innovations.pdf | 2017-06-01 14:55 | 78K | ||
| README.html | 2017-06-02 13:39 | 2.9K | ||
| README.txt | 2017-06-06 12:35 | 1.6K | ||
| Subpanel_Layout.pdf | 2017-06-02 09:32 | 425K | ||
| Thumbs.db | 2017-06-06 12:24 | 98K | ||
| orders/ | 2017-06-07 10:21 | - | ||
This is a polycarbonate box with the necessary DC/DC converter for supplying power to the top of the EM cable and passing 3-wire CAN as well.The unit will have the same bulkhead as the PTO and a dorn gland for a whip that will plug into a MC style bulkhead on the top of the EMCABLE.
The bulkhead on the top of the EM cable will match pinout with the bulkhead already wired at the bottom.
The DC/DC in the box will be the same DC/DC and carrier board as used in the Spring Controller electronics. MBARI has spares, but a board build must be ordered, lead time 1-2 weeks.
All other parts are in stock if a potted splice acceptable 2' above the connection to the top of the EM Cable. If not, a cable at the appropriate distance can be made for the same cost, but has a 4-6 week lead time.
| File Name | Information |
|---|---|
| PowerBuoy_10_PTO Replacement.pdf | Schematic |
| PTO_ReplacementJunction_BOM.pdf | Bill of Materials |
| Subpanel_Layout.pdf | 1:1 Scaled subpanel layout sketch |
| 6x6x3-Impact.pdf | Datasheet for the enclosure |
| 6x6x3-Hinged.pdf | Mechanical drawing of the enclosure |
| Date | Notes |
|---|---|
| 2017-06-01 | Initial Design |
| 2017-06-02 | Budget updated after receiving quotes |