Rover Dive Notes Summary P. McGill Dive 1, Pt. Lobos, 11Jul06 Accelerometers were on vehicle Descended at 36 m/min Rover moved on schedule Treads slipped on wheels, hung up on frame Comp oil levels way down Couldn't talk to modem, too noisy (no baffle on topside xducer) Emergency drop-weight release tough to pull, finally successful Lost drop weight Dive 2, Pt. Lobos, 18Jul06 Accelerometers were on vehicle Descended at 39 m/min Rover moved on schedule Oil seen leaking from motor shaft seals Successful acoustic drop-weight release Dive 3, Atlantis, 6Aug06 Descended at 32 m/min Observed with Alvin (Sherman, McGill) All moves successful Had acoustic comms, but burn wire didn't release weight Pulled manual release Dive 4, Atlantis, 10Aug06 Descended at ~40 m/min Observed with Alvin (Chase) All moves successful but turn failed Couldn't establish acoustic comms, topside xducer trailing ship Pulled manual release Dive 5, Atlantis, 17Aug06 Descended at ~40 m/min Observed with Alvin (Pargett) All moves successful Successful acoustic drop-weight release, burn time 12 min Dive 6, Pt. Lobos, 18Dec06 Launched w/out spar buoy by request of Lobos crew Descended at 39 m/min Software problem (task scheduling error), program didn't run First time with baffle on acoustic modem topside xducer? Successful acoustic drop-weight release, burn time 12 min Dive 7, Pt. Lobos, 2Jan07 No data, I wasn't on cruise Was stbd rack and chamber tested? Dive 8, W. Flyer, 31Jan07 Descended at ? m/min Nav bad, could find Rover with ROV until searching for 1 hr 39 min Software problem (unitialized var), program didn't run Successful acoustic drop-weight release, burn time 11 min Dive 9, W. Flyer, 2Feb07 Descended at 36 m/min Rover mission software started in midwater, aborted acoustically Raised rack from down position acoustically so it wouldn't impact first First successful insertion/removal of BR chamber (stbd) Sediment switch sticking Successful turns into current First BR oxygen measurement, 36 hrs Chamber left in down position after measurement Successful acoustic drop-weight release, burn time 11 min Dive 10, Pt. Lobos, 29May07 Descended at 37 m/min First dive with both chambers, completed 3 cycles Port chamber switch not working, insertion hits bottom limit, lifts whole Rover Successful acoustic drop-weight release, burn time 12 min Fitting knocked off of stbd motor housing, lost lots of oil on recovery Dive 11, W. Flyer, 7Jun07 Descended at 37 m/min 2 successful cycles before starting long mission Bubbles released from port chamber when valves opened No ROV dive due to weather, Rover release acoustically, burn time 12 min Strobe beacon lens smashed during recovery Dive 12, Pt. Lobos, 10Sep07