*  Performance checking for design F:/mbari work/linear actuator pcb/linear actuato drive board.brd
********************************************************************************

Ratsnest schedule check
-------------------------------
* OK.

DRC checks
----------------------
* The number of physical/spacing csets (2) is high compared to the
  number of nets (11) Suggest examining constraint model.
  ISSUE: Misuse of the Allegro constraint model such as using a spacing
         cset for each diffpair in the design. Result is system
         performance degradation.


Dynamic shape check
-------------------------------
* OK.

Sector table check
-------------------------------
* OK.

Constraint set check
---------------------------------
* OK.

NODRC_SYM_SAME_PIN check
---------------------------------
* OK.

Cross section check for bad dielectric constant values
--------------------------------------------------------
* OK.

Padstack size check
----------------------
* OK.

Conductor line check
------------------------------
* OK.

Design Constraints Statistics
---------------------------------
  Physical csets       =     1
  Spacing csets        =     1
  Same net csets       =     1
  Electrical csets     =     0
  Other csets          =     0
  Total csets        ===     3

  Cset relation table  =     0

* OK.

=========
SUMMARY
=========

1 problems found.	0 maintenance problems found.