Full-Speed Simulator 13 Jan 2016 Agenda *** Progress *** The "Resource Unavailable" and Ctrl-C-hanging bugs did not occur last time out, and appear to be fixed. Congratulations to Kent, Hans & Rich. *** Overall Objectives: *** 1) Merge with the trunk. 2) Start a new branch and proceed with combining Navigation, DynamicControl and Layered Control into one process. *** Specific Tasks: *** * Single-Task Guidance, Navigation and Control. Kent, Rich, Hans, Rob * Animation - Rob. Expand Prof. Rock's Matlab animation to 3D. This can/will show where the Imagenexes have problems. * Look further at water-column modeling. (Rob?) * Other stuff: - Investigate why the CPU is not (even close to being) fully loaded when the VM is. - Expand the Qnx Vm disk space from 1G, which is limiting. - Learn how to change the Qnx Vm to a static IP and back. - Investigate how to get the Qnx Vm to "see" moonjelly over wifi. Otherwise any CVS work requires physical presence at Mbari. - Develop more formal pre-dive test proceedure: - Simulation of the upcoming missions. - Lab1.cfg deck mission on the vehicle. (Kearfott aligned, magnet in or out?) - On-vehicle unit hardware tests: * Imagenex * Kearfott * Dvl *** Schedule *** * Iceberg hunt up in Newfoundland this June. *** Notes: ***