Full-Speed Simulator 18 May 2016 Agenda *** Progress *** GNC integration. *** Overall Objectives: *** 1) Merge into the trunk. 2) Periodically update FastSim/gnc from the trunk until merged. 3) *** Specific Tasks: *** * Single-Task Guidance, Navigation and Control. Kent, Rich, Hans, Rob * Animation - Rob. Expand Prof. Rock's Matlab animation to 3D. This can/will show where the Imagenexes have problems. * Look further at water-column modeling. (Rob?) * Other stuff: - Investigate why the CPU is not (even close to being) fully loaded when the VM is. - Expand the Qnx Vm disk space from 1G, which is limiting. - Learn how to change the Qnx Vm to a static IP and back. - Investigate how to get the Qnx Vm to "see" moonjelly over wifi. Otherwise any CVS work requires physical presence at Mbari. - Develop more formal pre-dive test proceedure: - Simulation of the upcoming missions. - Lab1.cfg deck mission on the vehicle. (Kearfott aligned, magnet in or out?) - On-vehicle unit hardware tests: * Imagenex * Kearfott * Dvl *** Schedule *** Kent: Will make hay in May, hey! June through August can't do much. Will start on Oasis 5 documentation. Can resume part-time Rob: Will start on animation. Rich: Can't start until July. 6 June I2map, 9 June Camera deployment. Summary: Kent will work some more this month with a little consultation from Rich and Rob. *** Notes: *** Test plan for the new gnc code: - Various fast simulations. * Document the simulations and pass/fail. - Real-time deck test on the vehicle. Metric for success? - Ask Hans. - Simpler code. - Faster simulation. Measure before and after. *** Notes: ***