Full-Speed Simulator 8 June 2016 Agenda *** Discussion Topics: * Examing hours versus tasks remaining. Who is going to do what? Used/Total (hours) Rob 22/140 Rich 59/240 Kent 126/200 Hans 0/ 20 * How to test the new gnc code? * How to proceed with the new gnc code? Consolidate Servers? * Propose any other simulation work for next year? *** Specific Tasks: *** * Kent - Consolidate Navigation, Layered Control and Dynamic Control Servers?? * Animation - Rob. Expand Prof. Rock's Matlab animation to 3D. This can/will show where the Imagenexes have problems. * Other stuff: - Investigate why the CPU is not (even close to being) fully loaded when the VM is. - Expand the Qnx Vm disk space from 1G, which is limiting. - Learn how to change the Qnx Vm to a static IP and back. - Investigate how to get the Qnx Vm to "see" moonjelly over wifi. Otherwise any CVS work requires physical presence at Mbari. - Develop more formal pre-dive test proceedure: - Simulation of the upcoming missions. - Lab1.cfg deck mission on the vehicle. (Kearfott aligned, magnet in or out?) - On-vehicle unit hardware tests: * Imagenex * Kearfott * Dvl * Look further at water-column modeling. (Rob?) *** Schedule *** Kent: Rob: Will start on animation. Rich: Can't start until July. 6 June I2map, 9 June Camera deployment. *** Notes from Last Time: *** Test plan for the new gnc code: - Various fast simulations. * Document the simulations and pass/fail. - Real-time deck test on the vehicle. Metric for success? - Ask Hans. - Simpler code. - Faster simulation. Measure before and after. *** Notes *** What caused Monday's abort? Kent will take a look. Rob started simulating the latest gnc code; will continue. What to do next for gnc code development: 1. Simulate existing gnc code. 2. Down-merge latest updates from trunk to FastSim 3. Down-merge latest updates from FastSim to gnc. 4. Decide upon further improvements. 5. Implement further improvements. 6. Repeat 1-3. 7. Develop specific sea-qualification tests. 8. Vehicle deck tests. 9. Piggyback sea trial.