28JAN25 R. CARSON/VENTANA DEPLOY GEOSENSE DAS --------------------------------------------- - LEFT DOCK 0706 PST AIRTEMP ~O °C - ON STATION ~0845 PST - DAS SUBMERGED 0900 PST - PAYING OUT CARLE AT ~1 KT - END OF CABLE AT SHEAVE 0915 PST - RELEASE LINKED INTO LINE, CONTINUING DOWN 0922 PST - LINE POPPED OUT OF BLOCK, RELEASING LINE O941 PST - ALL LINE ONBOARD 0950 PST - ON STATION OVER DAS FRAME, RETRIEVING CRAB POT LINE NEARBY 1020 PST - HAVING PROBS W/SHIP HYD PRESSURE, CRANE CAN'T LIFT ROV. ENGINEER ADJUSTING PRESS 1100 PST - ROV LAUNCH DIVE #4611 1118 PST - LOST CRANE HYDRAULICS ON LAUNCH, MOTOR OVERLOAD TRIPPED - RELAUNCH ROV AFTER SWITCHING TO BACKUP HYD PUMP 1205 PST - ON BOTTOM 379 M 1219 PST - DAS AT N 36 47.5523, W 121 53.0884, 380.5 M DEPTH - DEEP SEA CONNECT ON AND BURNT TOAST OUT 1228 PST - CONNECTED TO SINTELA 1232 PST
 NOISE FLOOR -77.15 DB PACKAGE LANDED RIGHT-SIDE UP
 DOWNLOADED DATA FILES - FLYING DOWN CABLE ROUTE. FIRST ~500 M IS PRETTY STRAIGHT BUT THEN LOTS OF LOOPS AND FIGURE EIGHTS. - AT END OF CABLE 1323 PST
 N 36 47.4283, W 121 53.5082, 381.5 M DEPTH - PULLED END ~12.5 M FARTHER AHEAD, NEW END AT N 36 47.4256, W 121 53.5156 1335 PST - ROV OFF BOTTOM 1353 PST - ROV ON DECK 1422 PST - AT DOCK 1508 PST