14 Aug 2006 SJensen Created a Revision 4 to try to incorporate the stir motors and Pressure analog back to Elmo's. This requires ethernet to ESP to come out of main can to the ELmo can and then to ESP. The stir motors need a Pie connector added the main can. on Dwarf power Board wiring harness: (10/5/05 CE) changed J5 to J9 to match System drawing (Power to motor conrol can) changed J6 to J10 to match System drawing (Power and comms in from ROV) changed P1 to J16 to match System drawing (Ethernet to ESP) changed J7 to P5 to match System drawing (Power to ESP) changed ASSM1 to AMMS10 to match system drawing (JWS300-12) on System Drawing: (10/5/05) added wire to ASSM3 from Dwarf power board to power bus added wire to MINM15FCRL connectors from 24VDC on Basoon Comms harness: (10/5/05 CE) changed P1 to J13 to match system drawing on Linear Actuator Harness: (10/5/05 CE) changed J3 to J25 to match system drawing changed J8 to J26 to match system drawing changed J6 to J8 to match system drawing on System Drawing: (10/13/05 CE) changed all MCDC8F_BLK and MCDC8M_BLK to MCIL8's added a RS232-TTL unit to Debug cable NOTE: need to verify RX, TX on comm harness's