#6/25/02 # Flush Process for new valve manifold # Begins after filter puck is unloaded # Assumes syringe homed # modified 3/29/03 for embedded unit under pressure # leaves all valves HOME # mod to flush air line, etc 8/11/04 # SPflush = 5% bleach in water # M1/2 flush = sig water + 0.05% Tween PROGRAM: FLSH_P SHUTTLE FLUSH # begin flush sequence FILTERCLAMP CLOSE # for steel flush puck SYRINGE PULL 12 SPflush # 5% bleach DELAYSEC 20 SYRINGE PUSH 11 Waste # flush exhaust VALVEPORT Exhaust HOME #SYRINGEJOG PULL 3 # depressurize exhaust line VALVEPORT Waste HOME # relieve vacuum DELAYSEC 5 SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 20 SPflush # 5% bleach DELAYSEC 25 SYRINGE PUSH 18 Sample # flush sample port VALVEPORT Intake HOME #SYRINGEJOG PULL 3 # depressurize intake line VALVEPORT Air SET # relieve vacuum DELAYSEC 5 SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 5 FlushM2 # distilled water with 0.05% Tween DELAYSEC 60 # help to remove bleach SYRINGE PULL 4 FlushM2 # distilled water with 0.05% Tween DELAYSEC 60 # help to remove bleach SYRINGE PULL 3 FlushM2 # distilled water with 0.05% Tween DELAYSEC 60 # help to remove bleach VALVEPORT FlushM2 HOME SYRINGEJOG PULL 8 # clear manifold 2 of flush DELAYSEC 10 SYRINGE PUSH 18 Puck # ck that all liquid is cleared VALVEPORT Puck HOME SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 3 FlushM2 # distilled water with 0.05% Tween DELAYSEC 60 # help to remove bleach VALVEPORT FlushM2 HOME SYRINGEJOG PULL 5 # clear manifold 2 of flush DELAYSEC 10 SYRINGE PUSH 5 Air # flush air line DELAYSEC 20 SYRINGE PULL 3 Air # clear air line DELAYSEC 20 SYRINGE PULL 3 Air # clear air line DELAYSEC 10 SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 5 FlushM1 # distilled water with 0.05% Tween DELAYSEC 45 SYRINGE PULL 5 FlushM1 # distilled water with 0.05% Tween DELAYSEC 45 VALVEPORT FlushM1 HOME SYRINGEJOG PULL 3.5 # clear manifold 1 of flush DELAYSEC 10 SYRINGE PUSH ALL ToxicWaste # ck that all liquid is cleared VALVEPORT ToxicWaste HOME VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME VALVEPORT Air HOME FILTERCLAMP OPEN SHUTTLE LOAD END