# macro for creating sample lysate for sand hybe rxn # in situ ESP Delta unit - new valve manifold # lysis solun. pushed in from top; pressure push/mix # rev 048 Aug 21 2003 # mod to REDUCE puck pressure # NO SET rinse # gives ~1.5ml+ ml lysate # heating time 16 min # run time is ~26min # mod for encapsulated heater pad and 5um/0.45um/ss frit assmbly # mod based on the run done 8/12/03 to eliminate PUCK PRESSURE DURING HEAT # mod for 0.2 filter # mod to inc pre-heat time by 1 min 8/21/03 # mod for Ti puck heat temp changed to 42.5 # mod lysis solun push/pulls for frozen filters 10/30/03 # mod 7/29/03 for new syringe # mod 7/30 for longer preheat # mod 8/11/04 for sample under pressure # mod 8/12 to flush M1 to prevent sw contam # mod 8/13 based on 8/12 run notes PROGRAM: SH1B SYRINGE PULL 10 Sample # prime puck DELAYSEC 20 VALVEPORT Intake HOME SYRINGE PUSH ALL Waste VALVEPORT Exhaust HOME SYRINGE PULL 22.5 Sample DELAYSEC 30 VALVEPORT Intake HOME SYRINGE PUSH ALL Waste VALVEPORT Exhaust HOME SYRINGE PULL 22.5 Sample # sample vol ~50ml DELAYSEC 45 VALVEPORT Intake HOME SYRINGE PUSH ALL Waste VALVEPORT Exhaust HOME #Done sampling SYRINGEJOG PULL 3 #DEPR. EXAHUST VALVEPORT Waste HOME #ISOLATE WASTE LINE DELAYSEC 5 SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 VALVEPORT Syringe HOME #NOW DO SAMPLE SIDE SYRINGEJOG PULL 3 DELAYSEC 5 VALVEPORT Sample HOME # depress complete DELAYSEC 15 VALVEPORT M3Bypass SET DELAYSEC 5 SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME SYRINGEJOG PULL 10 DELAYSEC 45 SYRINGE PULL 7 Air DELAYSEC 45 VALVEPORT M3Bypass SET # relieve vacuum DELAYSEC 7 SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 SYRINGE PULL 1.5 M3Bypass DELAYSEC 2 SYRINGE PUSH ALL ToxicWaste # burp M1 loop DELAYSEC 2 VALVEPORT ToxicWaste HOME SYRINGE PULL 2 FlushM2 DELAYSEC 10 VALVEPORT FlushM2 HOME SYRINGEJOG PULL 4 DELAYSEC 5 SYRINGE PUSH 5 M1Bypass # CLEAR M1 OF SW DELAYSEC 5 SYRINGEJOG PULL 3 DELAYSEC 5 SYRINGEJOG PULL 3 DELAYSEC 5 SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 SYRINGE PULL 2 FlushM1 DELAYSEC 7 VALVEPORT FlushM1 HOME SYRINGEJOG PULL 3 DELAYSEC 4 SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 SYRINGE PULL 1.0 Lysis # premix lysis/sample buffer DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # rinse syringe DELAYSEC 2 SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 SYRINGE PULL 1.5 M3Bypass SYRINGE PUSH ALL ToxicWaste # burp M1 loop HEAT 46 15 # 6/18/04 cal VALVEPORT Puck SET # relieve vacuum/vent lower loop DELAYSEC 2 VALVEPORT Air SET # vent puck during preheat DELAYMIN 4 SYRINGE PULL 2 Lysis DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # syringe @ 5.5 DELAYSEC 2 SYRINGE PUSH 1.5 Puck DELAYSEC 2 VALVEPORT Puck HOME # leave syringe SET; others home SYRINGEJOG PUSH 3.5 # leaves 0.5mL in syringe DELAYSEC 7 SYRINGEJOG PULL 2 # syringe at 2.5 DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISh DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 # heater power begins cycling SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 #SYRINGEJOG PUSH 0.75 #SYRINGEJOG PULL 0.75 # SWISH; syringe @ 2.75 #DELAYMIN 2 # heat turns off w/~1 min left SYRINGEJOG PUSH 1.5 # Syringe @1 SYRINGE PUSH ALL ToxicWaste DELAYSEC 3 VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME SYRINGEJOG PULL 5.5 # draw vacuum; AT 5.5 DELAYSEC 10 SYRINGE PULL 1.5 Air # suck lysate in syringe; AT 7 DELAYSEC 10 VALVEPORT M3Bypass SET # syringe valve now SET DELAYSEC 5 VALVEPORT M3Bypass HOME # isolate lysate; syringe and air SET END