# 4/21/03 used 6-9-03 # Flush Process for new valve manifold # Begins after filter puck is unloaded # Assumes syringe homed # ** For embedded unit NOT under pressure # samll vol flush between SH trials # leaves all valves HOME # FOR SH2 BLANK RUN TEST SERIES PROGRAM: SH2FL SHUTTLE FLUSH # begin flush sequence FILTERCLAMP CLOSE 185000 # for steel flush puck SYRINGE PULL 7 FlushM2 # distilled water with 0.01% IGEPAL DELAYSEC 15 VALVEPORT FlushM2 HOME SYRINGEJOG PULL 10 DELAYSEC 15 # clear manifold 2 of flush SYRINGE PUSH 15 Puck # ck that all liquid is cleared VALVEPORT Puck HOME SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 SYRINGE PULL 5 FlushM1 # distilled water with 0.01% IGEPAL DELAYSEC 10 VALVEPORT FlushM1 HOME SYRINGEJOG PULL 3.5 # clear manifold 1 of flush SYRINGE PUSH ALL ToxicWaste # ck that all liquid is cleared SYRINGE PULL 1 M3Bypass SYRINGE PUSH ALL ToxicWaste # burp M1 loop VALVEPORT ToxicWaste HOME VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME FILTERCLAMP OPEN SHUTTLE LOAD END