# macro for creating sample lysate for sand hybe rxn # in situ ESP Delta unit - new valve manifold # lysis solun. pushed in from top; pressure push/mix # rev 045 Aug 12 2003 # mod to reduce puck pressure # NO SET rinse # no 2nd air-out post sample # gives ~1.5ml+ ml lysate # heating time 15 min # run time is ~26min # mod for encapsulated heater pad and 5um/0.45um/ss frit assmbly # mod based on the run done 8/4/03 with sh1s_2.txt # mod based on the run done 8/12/03 to eliminate sw backflow thru TWaste PROGRAM: SSH1 SYRINGE PULL 5 Sample # prime puck DELAYSEC 20 SYRINGE PUSH ALL ToxicWaste # should be Waste for in situ SYRINGE PULL 22.5 Sample DELAYSEC 30 # increased to compensate for 0.45 sandwich VALVEPORT Sample HOME SYRINGE PUSH ALL ToxicWaste # Changed to prevent SW contamination VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME SYRINGEJOG PULL 5 DELAYSEC 20 SYRINGE PULL 3.0 Air DELAYSEC 30 VALVEPORT M3Bypass SET # relieve vacuum DELAYSEC 7 SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 SYRINGE PULL 1.5 M3Bypass DELAYSEC 2 SYRINGE PUSH ALL ToxicWaste # burp M1 loop DELAYSEC 2 SYRINGE PULL 4 M3Bypass VALVEPORT M3Bypass HOME SYRINGEJOG PUSH 3 # INC PRESSURE IN PUCK SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 VALVEPORT Syringe HOME SYRINGEJOG PULL 5 DELAYSEC 10 VALVEPORT M3Bypass SET # relieve vacuum DELAYSEC 7 SYRINGE PULL 5 Air DELAYSEC 20 VALVEPORT M3Bypass SET # relieve vacuum DELAYSEC 7 SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 1.0 Lysis # premix lysis/sample buffer DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # rinse syringe SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 1.5 M3Bypass SYRINGE PUSH ALL ToxicWaste # burp M1 loop DELAYSEC 5 SYRINGE PULL 2.2 Lysis # incl comp for backlash DELAYSEC 7 # increase from 5 to 7 sec VALVEPORT Lysis HOME SYRINGEJOG PULL 4.25 # should leave 2ml in syringe SYRINGE PUSH 2.5 Puck # prime top loop DELAYSEC 3 VALVEPORT Puck HOME # isolate puck SYRINGEJOG PUSH 3 # leaves 0.95mL in syringe DELAYSEC 5 SYRINGEJOG PULL 2.5 # RELIEVE PRESSURE; syringe HEAT 57 15 # 85C DELAYMIN 2 SYRINGEJOG PUSH 1.5 SYRINGEJOG PULL 1.5 # PRESSURE PUSH DELAYMIN 2 SYRINGEJOG PUSH 1.5 SYRINGEJOG PULL 1.5 # PRESSURE PUSH DELAYMIN 2 SYRINGEJOG PUSH 1.5 SYRINGEJOG PULL 1.5 # PRESSURE PUSH DELAYMIN 2 SYRINGEJOG PUSH 1.5 SYRINGEJOG PULL 1.5 # PRESSURE PUSH DELAYMIN 2 SYRINGEJOG PUSH 1.5 SYRINGEJOG PULL 1.5 # PRESSURE PUSH DELAYMIN 2 SYRINGEJOG PUSH 1.5 SYRINGEJOG PULL 1.5 # PRESSURE PUSH DELAYMIN 2 SYRINGEJOG PUSH 1.5 SYRINGEJOG PULL 1.5 # PRESSURE PUSH DELAYMIN 1 # heat ends @15min SYRINGEJOG PUSH 2.5 # inc puck pressure; syringe @ 0.95 SYRINGE PUSH 0.7 ToxicWaste # blow off SOME pressure; syringe @ 0.25 DELAYSEC 3 VALVEPORT Syringe HOME SYRINGEJOG PULL 4.5 # draw vacuum; AT 4.75 DELAYSEC 10 SYRINGE PULL 2.25 Air # suck lysate in syringe; AT 7 DELAYSEC 15 VALVEPORT M3Bypass SET DELAYSEC 2 VALVEPORT Syringe SET # isolate lysate in syringe END