# macro for creating sample lysate for sand hybe rxn # in situ ESP Delta unit - new valve manifold # lysis solun. pushed in from top; pressure push/mix # rev 048 Aug 21 2003 # mod to REDUCE puck pressure # NO SET rinse # gives ~1.5ml+ ml lysate # heating time 16 min # run time is ~26min # mod for encapsulated heater pad and 5um/0.45um/ss frit assmbly # mod based on the run done 8/12/03 to eliminate PUCK PRESSURE DURING HEAT # mod for 0.2 filter # mod to inc pre-heat time by 1 min 8/21/03 # mod for Ti puck heat temp changed to 42.5 # mod lysis solun push/pulls for frozen filters 10/30/03 # mod 7/29/03 for new syringe # mod 7/30 for longer preheat PROGRAM: SSH1E_P SYRINGE PULL 10 Sample # prime puck DELAYSEC 20 SYRINGE PUSH ALL ToxicWaste # should be Waste for in situ SYRINGE PULL 22.5 Sample DELAYSEC 45 # increased to compensate for 0.45 sandwich SYRINGE PUSH ALL ToxicWaste #SYRINGE PULL 22.5 Sample #DELAYSEC 45 # increased to compensate for 0.45 sandwich #SYRINGE PUSH ALL ToxicWaste VALVEPORT Sample HOME # depress complete VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME SYRINGEJOG PULL 7 DELAYSEC 30 SYRINGE PULL 5.0 Air DELAYSEC 30 VALVEPORT M3Bypass SET # relieve vacuum DELAYSEC 7 SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 SYRINGE PULL 1.5 M3Bypass DELAYSEC 2 SYRINGE PUSH ALL ToxicWaste # burp M1 loop SYRINGE PULL 1.0 Lysis # premix lysis/sample buffer DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # rinse syringe SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 1.5 M3Bypass SYRINGE PUSH ALL ToxicWaste # burp M1 loop HEAT 46 15 # 6/18/04 cal VALVEPORT Puck SET # relieve vacuum/vent lower loop DELAYSEC 2 VALVEPORT Air SET # vent puck during preheat DELAYMIN 4 SYRINGE PULL 2 Lysis DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # syringe @ 5.5 DELAYSEC 2 SYRINGE PUSH 1.5 Puck DELAYSEC 2 VALVEPORT Puck HOME # leave syringe SET; others home SYRINGEJOG PUSH 3.5 # leaves 0.5mL in syringe DELAYSEC 7 SYRINGEJOG PULL 2 # syringe at 2.5 DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISh DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 # heater power begins cycling SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 #SYRINGEJOG PUSH 0.75 #SYRINGEJOG PULL 0.75 # SWISH; syringe @ 2.75 #DELAYMIN 2 # heat turns off w/~1 min left SYRINGEJOG PUSH 1.5 # Syringe @1 SYRINGE PUSH ALL ToxicWaste DELAYSEC 3 VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME SYRINGEJOG PULL 5.5 # draw vacuum; AT 5.5 DELAYSEC 10 SYRINGE PULL 1.5 Air # suck lysate in syringe; AT 7 DELAYSEC 10 VALVEPORT M3Bypass SET # syringe valve now SET DELAYSEC 5 VALVEPORT M3Bypass HOME # isolate lysate; syringe and air SET END