# macro for creating sample lysate for sand hybe rxn # in situ ESP Delta unit - new valve manifold # lysis solun. pushed in from top; pressure push/mix # rev 047 Aug 18 2003 # mod to REDUCE puck pressure # NO SET rinse # gives ~1.5ml+ ml lysate # heating time 14 min # run time is ~30min # mod for encapsulated heater pad and 5um/0.45um/ss frit assmbly # mod based on the run done 8/12/03 to eliminate PUCK PRESSURE DURING HEAT # 10/10/03 changed temp cal for Ti puck # 11/4/03 reduced swish vol to 1 ml and reduced backoff # 6/17/04 changed temp cal for new Ti pucks (RW; Johnny) # 6/23/ changed protocol slightly based on 6/17 run # 6/24/ revised based on 6/23 run and 6/24 runs (176001tif) # 6/29/04 revised to lower pressure # 7/14/04 revised to pull sample through intake loop without preesure pot PROGRAM: SSH1_PIN SYRINGE PULL 22.5 Sample # prime intake loop and puck DELAYSEC 20 SYRINGE PUSH ALL ToxicWaste # should be Waste for in situ SYRINGE PULL 22.5 Sample DELAYSEC 30 # increased to compensate for 0.45 sandwich VALVEPORT Sample HOME SYRINGE PUSH ALL ToxicWaste # Changed to prevent SW contamination SYRINGE PULL 22.5 Sample # finish clearing intake loop DELAYSEC 30 # increased to compensate for 0.45 sandwich VALVEPORT Sample HOME SYRINGE PUSH ALL ToxicWaste # Changed to prevent SW contamination VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME SYRINGEJOG PULL 5 DELAYSEC 20 SYRINGE PULL 3.0 Air DELAYSEC 20 VALVEPORT M3Bypass SET # relieve vacuum DELAYSEC 7 SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 SYRINGE PULL 1.5 M3Bypass DELAYSEC 2 SYRINGE PUSH ALL ToxicWaste # burp M1 loop DELAYSEC 2 SYRINGE PULL 4 M3Bypass VALVEPORT M3Bypass HOME SYRINGEJOG PUSH 3 # INC PRESSURE IN PUCK SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 VALVEPORT Syringe HOME SYRINGEJOG PULL 5 DELAYSEC 10 SYRINGE PULL 5 Air DELAYSEC 20 VALVEPORT M3Bypass SET # relieve vacuum DELAYSEC 5 SYRINGE PUSH ALL ToxicWaste DELAYSEC 2 SYRINGE PULL 1.5 M3Bypass DELAYSEC 2 SYRINGE PUSH ALL ToxicWaste # burp M1 loop DELAYSEC 2 SYRINGE PULL 1.0 Lysis # premix lysis/sample buffer DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # rinse syringe SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 1.5 M3Bypass SYRINGE PUSH ALL ToxicWaste # burp M1 loop HEAT 46 15 # 6/18/04 cal VALVEPORT Puck SET # relieve vacuum/vent lower loop DELAYSEC 2 VALVEPORT Air SET # vent puck during preheat DELAYMIN 2 SYRINGE PULL 2 Lysis DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # syringe @ 5.5 DELAYSEC 2 SYRINGE PUSH 1.5 Puck DELAYSEC 2 VALVEPORT Puck HOME # leave syringe SET; others home SYRINGEJOG PUSH 3.5 # leaves 0.5mL in syringe DELAYSEC 7 SYRINGEJOG PULL 2 # syringe at 2.5 DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISh DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 # heater power begins cycling SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH; syringe @ 2.75 DELAYMIN 2 # heat turns off w/~1 min left SYRINGEJOG PUSH 1.5 # Syringe @1 SYRINGE PUSH ALL ToxicWaste DELAYSEC 3 VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME SYRINGEJOG PULL 5.5 # draw vacuum; AT 5.5 DELAYSEC 10 SYRINGE PULL 1.5 Air # suck lysate in syringe; AT 7 DELAYSEC 10 VALVEPORT M3Bypass SET # syringe valve now SET DELAYSEC 5 VALVEPORT M3Bypass HOME # isolate lysate; syringe and air SET END