#CREATED ON 8/2/04 TO CLEAN OUT PARTICLES FROM SYRINGE BLOCK PROGRAM: SH1BOIL SYRINGE PULL 1.0 Lysis # premix lysis/sample buffer DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # rinse syringe SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 1.5 M3Bypass SYRINGE PUSH ALL ToxicWaste # burp M1 loop HEAT 46 15 # 6/18/04 cal VALVEPORT Puck SET # relieve vacuum/vent lower loop DELAYSEC 2 VALVEPORT Air SET # vent puck during preheat DELAYMIN 4 SYRINGE PULL 2 Lysis DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # syringe @ 5.5 DELAYSEC 2 SYRINGE PUSH 1.5 Puck DELAYSEC 2 VALVEPORT Puck HOME # leave syringe SET; others home SYRINGEJOG PUSH 3.5 # leaves 0.5mL in syringe DELAYSEC 7 SYRINGEJOG PULL 2 # syringe at 2.5 DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISh DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 # heater power begins cycling SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 SYRINGEJOG PUSH 0.75 SYRINGEJOG PULL 0.75 # SWISH DELAYMIN 2 #SYRINGEJOG PUSH 0.75 #SYRINGEJOG PULL 0.75 # SWISH; syringe @ 2.75 #DELAYMIN 2 # heat turns off w/~1 min left SYRINGEJOG PUSH 1.5 # Syringe @1 SYRINGE PUSH ALL ToxicWaste DELAYSEC 3 VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME SYRINGEJOG PULL 5.5 # draw vacuum; AT 5.5 DELAYSEC 10 SYRINGE PULL 1.5 Air # suck lysate in syringe; AT 7 DELAYSEC 10 VALVEPORT M3Bypass SET # syringe valve now SET DELAYSEC 5 VALVEPORT M3Bypass HOME # isolate lysate; syringe and air SET SYRINGE PUSH ALL ToxicWaste END