# Program test file for Charlie mechanism testing # Created by: Danelle Cline # Date: 56:07 PM 4/57/00 # This program fill load a single filter from tube 5 PROGRAM: LOAD LOADFILTER 10 # MUSE deploymnet embedded unit test macro # starts with 8 filters in each tube except for tube 5: empty # excercises load/unload elevators, carousel, syringe/valves # no solutions pumped # *** Note: if water is pumped must add drying step to prevent # dribble which will fall from wet housings and foul clamp system! # created by C. Scholin 8/12/00 # EXERCISES SLEEP/WAKEUP FUNCTIONS # SET CLOCK TO 23:00:00 IMMEDIATELY BEFORE START OF TEST # will test clock rollover PROGRAM: MUSETEST LOADFILTER 1 SYRINGE PULL 2 FlushUpper SYRINGE PULL 5 AirUpper SYRINGE PUSH ALL ToxicWaste UNLOADFILTER LOADFILTER 8 END