# 4/21/03 used 6-9-03 # Flush Process for new valve manifold # Begins after filter puck is unloaded # Assumes syringe homed # ** For embedded unit NOT under pressure # samll vol flush between SH trials # do not push all for sample and waste ports or you get air bubbles! # leaves all valves HOME PROGRAM: SFL SHUTTLE FLUSH # begin flush sequence FILTERCLAMP CLOSE 185000 # for steel flush puck SYRINGE PULL 8 SPflush DELAYSEC 5 SYRINGE PUSH 7 Sample # flush sample port VALVEPORT Sample HOME SYRINGE PULL 7.5 SPflush DELAYSEC 5 SYRINGE PUSH 8 Waste # flush exhaust VALVEPORT Exhaust HOME SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 5 FlushM2 # distilled water with 0.01% IGEPAL DELAYSEC 15 VALVEPORT FlushM2 HOME SYRINGEJOG PULL 5 DELAYSEC 15 # clear manifold 2 of flush SYRINGE PUSH ALL Puck # ck that all liquid is cleared VALVEPORT Puck HOME SYRINGE PULL 10 FlushM1 # distilled water with 0.01% IGEPAL DELAYSEC 10 VALVEPORT FlushM1 HOME SYRINGEJOG PULL 3.5 # clear manifold 1 of flush DELAYSEC 10 SYRINGE PUSH ALL ToxicWaste # ck that all liquid is cleared VALVEPORT ToxicWaste HOME VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME FILTERCLAMP OPEN SHUTTLE LOAD END