# macro for creating sample lysate for sand hybe rxn used 6-9-03 # in situ ESP Delta unit - new valve manifold # lysis solun. pushed in from top; pressure push mix # rev 041 July 30 2003 # mod to reduce puck pressure and overcome filter bubble pt # the 5xSET rinse is with 0.005% IGEPAL # ~2 ml lysate # heating time 14 min # run time is ~26min # modified 8/1/03 for encapsulated puck and 0.45um/10um filter PROGRAM: SSH1 SYRINGE PULL 5 Sample # prime puck DELAYSEC 20 SYRINGE PUSH ALL Waste SYRINGE PULL 22.5 Sample DELAYSEC 30 # increased to compensate for 0.45 sandwich VALVEPORT Sample HOME SYRINGE PUSH ALL ToxicWaste # Changed to prevent SW contamination VALVEPORT Exhaust HOME #Done sampling SYRINGE PULL 4.0 SETrinse # 4x SET with 0.005% IGEPAL DELAYSEC 5 VALVEPORT SETrinse HOME SYRINGEJOG PULL 12 # clear manifold SYRINGE PUSH 15 Puck # clear syringe block mnfld DELAYSEC 20 VALVEPORT Puck HOME VALVEPORT Syringe HOME SYRINGEJOG PULL 10 DELAYSEC 10 SYRINGE PULL 6.0 Air DELAYSEC 20 VALVEPORT M3Bypass SET # relieve vacuum in syringe DELAYSEC 5 SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 15 Air # 2nd draw of air to dry out puck DELAYSEC 20 VALVEPORT M3Bypass SET # relieve vacuum in syringe DELAYSEC 5 SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 1.0 Lysis # premix lysis/sample buffer DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # rinse syringe SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 1.5 M3Bypass SYRINGE PUSH ALL ToxicWaste # burp M1 loop SYRINGE PULL 2 Lysis # incl comp for backlash DELAYSEC 30 # increase from 5 to 30 sec VALVEPORT Lysis HOME SYRINGEJOG PULL 4.5 # should leave 2ml in syringe SYRINGE PUSH 2.25 Puck # prime top loop VALVEPORT Puck HOME # isolate puck SYRINGEJOG PUSH 3.75 # leaves 0.5mL in syringe DELAYSEC 10 SYRINGEJOG PULL 2 #RELIEVE PRESSURE HEAT 57 14 # 85C DELAYMIN 2 SYRINGEJOG PUSH 2 DELAYSEC 10 SYRINGEJOG PULL 2 # PRESSURE PUSH DELAYMIN 3 SYRINGE PUSH 2 ToxicWaste # blow off SOME pressure VALVEPORT Syringe HOME SYRINGEJOG PULL 4 # draw vacuum; AT 4.5 DELAYSEC 10 SYRINGE PULL 2 Air # suck lysate in syringe; AT 6.5 DELAYSEC 15 VALVEPORT M3Bypass SET DELAYSEC 2 SYRINGE PUSH 2.25 Puck # recycle lysate 2nd pass VALVEPORT Puck HOME SYRINGEJOG PUSH 3.75 # syringe at .5 DELAYSEC 10 SYRINGEJOG PULL 2 DELAYMIN 3 SYRINGEJOG PUSH 2 # PRESSURE PUSH DELAYSEC 5 SYRINGEJOG PULL 2 DELAYMIN 3 SYRINGE PUSH 2 ToxicWaste # blow off SOME pressure VALVEPORT Syringe HOME SYRINGEJOG PULL 4 # draw vacuum; AT 4.5 DELAYSEC 10 SYRINGE PULL 2.5 Air # suck lysate in syringe; AT 7 DELAYSEC 20 VALVEPORT M3Bypass SET DELAYSEC 2 VALVEPORT Syringe SET # isolate lysate in syringe END