# macro for creating sample lysate for sand hybe rxn used 6-9-03 # in situ ESP Delta unit - new valve manifold # lysis solun. pushed in from top; pressure push/mix # rev 044 Aug 4 2003 # mod to reduce puck pressure # NO SET rinse # deleted 2nd air-out post sample # gives ~1.5ml+ ml lysate # heating time 15 min # run time is ~26min # mod for encapsulated heater pad and 5um/0.45um/ss frit assmbly # mod based on the run done 8/4/03 with sh1s_2.txt PROGRAM: SSH1 SYRINGE PULL 5 Sample # prime puck DELAYSEC 20 SYRINGE PUSH ALL ToxicWaste # should be Waste for in situ SYRINGE PULL 22.5 Sample DELAYSEC 30 # increased to compensate for 0.45 sandwich VALVEPORT Sample HOME SYRINGE PUSH ALL ToxicWaste # Changed to prevent SW contamination VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME SYRINGEJOG PULL 15 DELAYSEC 20 SYRINGE PULL 6.0 Air DELAYSEC 30 VALVEPORT M3Bypass SET # relieve vacuum DELAYSEC 7 SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 1.0 Lysis # premix lysis/sample buffer DELAYSEC 5 VALVEPORT Lysis HOME SYRINGEJOG PULL 3.5 # rinse syringe SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 1.5 M3Bypass SYRINGE PUSH ALL ToxicWaste # burp M1 loop DELAYSEC 5 SYRINGE PULL 2.2 Lysis # incl comp for backlash DELAYSEC 7 # increase from 5 to 7 sec VALVEPORT Lysis HOME SYRINGEJOG PULL 4.3 # should leave 2ml in syringe SYRINGE PUSH 2.75 Puck # prime top loop DELAYSEC 3 VALVEPORT Puck HOME # isolate puck SYRINGEJOG PUSH 3 # leaves 0.75mL in syringe DELAYSEC 10 SYRINGEJOG PULL 2.5 # RELIEVE PRESSURE; syringe HEAT 57 15 # 85C DELAYMIN 2 SYRINGEJOG PUSH 2 DELAYSEC 10 SYRINGEJOG PULL 2 # PRESSURE PUSH DELAYMIN 3 SYRINGEJOG PUSH 2 DELAYSEC 10 SYRINGEJOG PULL 2 # PRESSURE PUSH DELAYMIN 2 SYRINGEJOG PUSH 2 DELAYSEC 10 SYRINGEJOG PULL 2 # PRESSURE PUSH DELAYMIN 3 SYRINGEJOG PUSH 2 DELAYSEC 10 SYRINGEJOG PULL 2 # PRESSURE PUSH DELAYMIN 2 SYRINGEJOG PUSH 2 DELAYSEC 10 SYRINGEJOG PULL 2 # PRESSURE PUSH DELAYMIN 3 # heat ends @15min SYRINGE PUSH 3 ToxicWaste # blow off SOME pressure; syringe @ 0.25 DELAYSEC 3 VALVEPORT Syringe HOME SYRINGEJOG PULL 4 # draw vacuum; AT 4.25 DELAYSEC 10 SYRINGE PULL 2.25 Air # suck lysate in syringe; AT 6.5 DELAYSEC 15 VALVEPORT M3Bypass SET DELAYSEC 2 SYRINGE PUSH 2.75 Puck # 2nde pass; prime top loop DELAYSEC 2 VALVEPORT Puck HOME # isolate puck SYRINGEJOG PUSH 3 # leaves 0.75mL in syringe DELAYSEC 10 SYRINGE PUSH 0.5 ToxicWaste # blow off SOME pressure; syringe @ 0.25 DELAYSEC 3 VALVEPORT Syringe HOME SYRINGEJOG PULL 4 # draw vacuum; AT 4.25 DELAYSEC 10 SYRINGE PULL 2.75 Air # suck lysate in syringe; AT 7 DELAYSEC 20 VALVEPORT M3Bypass SET DELAYSEC 2 VALVEPORT Syringe SET # isolate lysate in syringe END