# Program test file for the ESP DELTA unit # This macro represents the steps taken to # rid ESP of blowback into upper and lower # manifold after system is exposed to higher # ambient pressure. # CREATED 3/22/01 BY C.Scholin, R. Marin PROGRAM: SH1 VALVEPORT Sample SYRINGEJOG PULL 10 # remove air and prime puck - ck vol DELAYSEC 30 SYRINGE PUSH ALL Waste SYRINGE PULL 22.5 Sample # may need to adjust vol. VALVEPORT INTAKE CLOSE SYRINGE PUSH ALL WASTE VALVEPORT EXHAUST CLOSE DELAYSEC 30 #CK DELAY TIME SYRINGE PULL 22.5 Sample # may need to adjust vol. VALVEPORT INTAKE CLOSE SYRINGE PUSH ALL WASTE VALVEPORT EXHAUST CLOSE DELAYSEC 30 #CK DELAY TIME SYRINGE PULL 22.5 Sample # may need to adjust vol. VALVEPORT INTAKE CLOSE SYRINGE PUSH ALL WASTE VALVEPORT EXHAUST CLOSE DELAYSEC 30 #CK DELAY TIME VALVEPORT TOGGLE CLOSE SYRINGEJOG PULL 2.5 VALVEPORT SAMPLE CLOSE VALVEPORT TOGGLE OPEN SYRINGEJOG PULL 2.5 VALVEPORT WASTE CLOSE SYRINGE PUSH ALL WASTE END