# Modified MUSE deploymnet embedded unit test macro # starts with 8 filters in each tube except for tube 5: empty # no solutions pumped # *** Note: if water is pumped must add drying step to prevent # dribble which will fall from wet housings and foul clamp system! # created by C. Scholin 8/12/00 # EXERCISES CAROUSEL, SYRINGE, ELEVATORS, BASIC CAMERA FUNCTIONS # AND SLEEP FUNCTION # Start macro with tube 5 empty, and 4 filters in all other tubes # Start with RTC set to 23:00:00 UTC. # Modified: 10:30 AM 02/02/2001 D.Cline added ACQUIREIMAGE 1000 step # to test camera seal # 10:32 AM 02/06/2001 D.Cline added EXIT WAKEUP to test sleep and wakeup # functions # 9:22 AM 2/13/01 D.Cline edited wakeup times to allow enough time # between samples for time delay PROGRAM: MLOAD LOADFILTER 9 SYRINGE PULL 5 FlushUpper SYRINGE PULL 5 AirUpper SYRINGE PUSH ALL ToxicWaste UNLOADFILTER LOADFILTER 9 SYRINGE PULL 5 FlushUpper SYRINGE PULL 5 AirUpper SYRINGE PUSH ALL ToxicWaste UNLOADFILTER LOADFILTER 9 SYRINGE PULL 5 FlushUpper SYRINGE PULL 5 AirUpper SYRINGE PUSH ALL ToxicWaste UNLOADFILTER END