# Program test file for the ESP DELTA unit # This macro represents the steps taken to # rid ESP of blowback into upper and lower # manifold after system is exposed to higher # ambient pressure. # CREATED 3/22/01 BY C.Scholin, R. Marin PROGRAM: SH1p LOADFILTER 1 #VALVEPORT Sample #SYRINGEJOG PULL 10 # remove air and prime puck - ck vol #DELAYSEC 30 #SYRINGE PUSH ALL Waste SYRINGE PULL 22.5 Sample # may need to adjust vol. VALVEPORT Intake CLOSE SYRINGE PUSH ALL Waste VALVEPORT Exhaust CLOSE DELAYSEC 30 #CK DELAY TIME SYRINGE PULL 22.5 Sample # may need to adjust vol. VALVEPORT Intake CLOSE SYRINGE PUSH ALL Waste VALVEPORT Exhaust CLOSE DELAYSEC 30 #CK DELAY TIME SYRINGE PULL 22.5 Sample # may need to adjust vol. VALVEPORT Intake CLOSE SYRINGE PUSH ALL Waste VALVEPORT Exhaust CLOSE DELAYSEC 30 #CK DELAY TIME VALVEPORT Toggle CLOSE SYRINGEJOG PULL 2.5 VALVEPORT Sample CLOSE VALVEPORT Toggle OPEN SYRINGEJOG PULL 2.5 VALVEPORT Waste CLOSE SYRINGE PUSH ALL Waste END