#6/25/02 # Flush Process for new valve manifold # Begins after filter puck is unloaded # Assumes syringe homed # modified 3/23/01 for embedded unit under pressure #leaves all valves HOME PROGRAM: FLSH SHUTTLE FLUSH # begin flush sequence FILTERCLAMP CLOSE # for steel flush puck SYRINGE PULL 15 SPflush # toxicant/flush for can ports SYRINGE PUSH ALL Waste # flush exhaust VALVEPORT Exhaust HOME SYRINGEJOG PULL 3 # depressurize exhaust line VALVEPORT Waste HOME # relieve vacuum DELAYSEC 5 SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 20 SPflush SYRINGE PUSH ALL Sample # flush sample port VALVEPORT Intake HOME SYRINGEJOG PULL 3 # depressurize intake line VALVEPORT Air SET # relieve vacuum DELAYSEC 5 SYRINGE PUSH ALL ToxicWaste SYRINGE PULL 10 FlushM2 # distilled water with 0.01% IGEPAL VALVEPORT FlushM2 HOME SYRINGEJOG PULL 5 # clear manifold 2 of flush SYRINGE PUSH ALL Puck # ck that all liquid is cleared VALVEPORT Puck HOME SYRINGE PULL 10 FlushM1 # distilled water with 0.01% IGEPAL VALVEPORT FlushM1 HOME SYRINGEJOG PULL 3.5 # clear manifold 1 of flush SYRINGE PUSH ALL ToxicWaste # ck that all liquid is cleared VALVEPORT ToxicWaste HOME VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME FILTERCLAMP OPEN SHUTTLE LOAD END