#6/25/02 # Flush Process for new valve manifold # Begins after filter puck is unloaded # Assumes syringe homed # modified 7/20/02 for embedded unit not under pressure # samll vol flush between SH trials # leaves all valves HOME PROGRAM: FLSH SHUTTLE FLUSH # begin flush sequence FILTERCLAMP CLOSE 231000 # for steel flush puck SYRINGE PULL 10 FlushM2 # distilled water with 0.01% IGEPAL DELAYSEC 5 VALVEPORT FlushM2 HOME SYRINGEJOG PULL 5 # clear manifold 2 of flush SYRINGE PUSH ALL Puck # ck that all liquid is cleared VALVEPORT Puck HOME SYRINGE PULL 10 FlushM1 # distilled water with 0.01% IGEPAL DELAYSEC 5 VALVEPORT FlushM1 HOME SYRINGEJOG PULL 3.5 # clear manifold 1 of flush SYRINGE PUSH ALL ToxicWaste # ck that all liquid is cleared VALVEPORT ToxicWaste HOME VALVEPORT M1Bypass HOME VALVEPORT Syringe HOME FILTERCLAMP OPEN SHUTTLE LOAD END