HR: 15:25h
AN: H53H-08 [Abstracts]
TI: An Integrated Bayesian Uncertainty Estimator: fusion of Input, Parameter and Model Structural
Uncertainty Estimation in Hydrologic Prediction System
AU: * Ajami, N K
EM: nkhodata@uci.edu
AF: University of California, Department of Civil and Environmental Engineering, Irvine, CA 92697
United States
AU: Duan, Q
EM: qduan@llnl.gov
AF: Lawrence Livermore National Laboratory, P.O. Box 808, Livermore, CA 94551
United States
AU: Sorooshian, S
EM: soroosh@uci.edu
AF: University of California, Department of Civil and Environmental Engineering, Irvine, CA 92697
United States
AB:
To-date single conceptual hydrologic models often applied to interpret physical processes within a watershed. Nevertheless
hydrologic models regardless of their sophistication and complexity are simplified representation of the complex, spatially
distributed and highly nonlinear real world system. Consequently their hydrologic predictions contain considerable
uncertainty from different sources including: hydrometeorological forcing inputs, boundary/initial conditions, model
structure, model parameters which need to be accounted for. Thus far the effort has gone to address these sources of
uncertainty explicitly, making an implicit assumption that uncertainties from different sources are additive. Nevertheless
because of the nonlinear nature of the hydrologic systems, it is not feasible to account for these uncertainties
independently. Here we present the Integrated Bayesian Uncertainty Estimator (IBUNE) which accounts for total uncertainties
from all major sources: inputs forcing, model structure, model parameters. This algorithm explores multi-model framework to
tackle model structural uncertainty while using the Bayesian rules to estimate parameter and input uncertainty within
individual models. Three hydrologic models including SACramento Soil Moisture Accounting (SAC-SMA) model, Hydrologic model
(HYMOD) and Simple Water Balance (SWB) model were considered within IBUNE framework for this study. The results which are
presented for the Leaf River Basin, MS, indicates that IBUNE gives a better quantification of uncertainty through
hydrological modeling processes, therefore provide more reliable and less bias prediction with realistic uncertainty
boundaries.
DE: 1846 Model calibration (3333)
DE: 1847 Modeling
DE: 1873 Uncertainty assessment (3275)
DE: 3238 Prediction (3245, 4263)
DE: 3245 Probabilistic forecasting (3238)
SC: Hydrology [H]
MN: Fall Meeting 2005