HR: 08:20h
AN: S21D-02 [Abstracts]
TI: Integrated System for Earthquake Early Warning and Quick Response Against Strong Motion -
In Case of the Tokyo Metro Company
AU: * Sato, T
EM: tsato@sdr.co.jp
AF: System and Data Research Co., Ltd., 3-25-3 Fujimi-dai, Kunitachi, Tokyo, 186-0003, Japan
AU: Saita, J
EM: jun@sdr.co.jp
AF: System and Data Research Co., Ltd., 3-25-3 Fujimi-dai, Kunitachi, Tokyo, 186-0003, Japan
AU: Nakamura, Y
EM: yutaka@sdr.co.jp
AF: System and Data Research Co., Ltd., 3-25-3 Fujimi-dai, Kunitachi, Tokyo, 186-0003, Japan
AB:
In July 2005, an earthquake of M6.0 attacked the Tokyo metropolitan area. This earthquake occurred at 35.5N and
140.2E with about 73km in depth, and the maximum JMA intensity was 5+ corresponding to MMI VIII
approximately. This earthquake occurred at north-west of Chiba prefecture and caused a traffic disturbance
widely in Tokyo metropolitan area. All the train operation had been stopped for a long time after the earthquake,
although a severe damage was not caused even in the area of high intensity. The longest down time for the train
operation was more than seven hours.
After the earthquake, we proposed a new system for early warning and quick response. Tokyo Metro Company
accepted our proposal, and we replaced and built the new early warning/quick response system as followed.
The system consists of two seismometer networks. One is the early warning system FREQL network with six
seismometers to control or stop the train operation immediately after the earthquake occurrence. And the other is
the portable digital seismometer AcCo network distributing 33 seismometers in every about three kilometers
mesh to grasp more detailed seismic motion on their service area.
The information from both FREQL network and AcCo network are gathered to the operation center and displayed
on the individual monitoring system. The monitoring system for AcCo can indicate the integrated information from
AcCo and FREQL on the subway network image. The AcCo monitoring system is also installed on the control
table for each subway line.
At the time of the earthquake, the early warning system detects at first the earthquake immediately and then the
33 local seismometers inform the actual earthquake motion of each site independently and rapidly. This system
realized quick response and restart of the train operation because the early warning became faster and checking
zone after earthquake was optimized. This updated system is expected to realize quicker response during and
after.
For the large system as the train operation, it is necessary for the control against the earthquake to equip the
system not only to issue the early warning but also to support the quick and rational recovery work after the
earthquake.
DE: 7212 Earthquake ground motions and engineering seismology
DE: 7215 Earthquake source observations (1240)
DE: 7294 Seismic instruments and networks (0935, 3025)
SC: Seismology [S]
MN: 2007 Fall Meeting