MBARI Mooring Deployment Cruise ================ Needed from Pt Sur: ==================== Trawl Winch Wide cheek block in center of A-frame Deck Hydraulics for spooler ( Only needed for if Pengo has to be re/unloaded during cruise or old mooring with T-string is being recovered) 480VAC for Pengo Quick release hook for deployment Cutting torch for cutting chain during recovery. ================== Loading Plan ================================= Load pengo, anchor, floatation balls, release, bouy, supply cages, release gear, spooler, spools, anchor plate, etc. Need use of Elect lab for release deck box. Deck cleat installed far enought forward so capstan can pull lines around it. Connect spooler (if used) to deck hydraulics. ===================== Cruise Plan ========================== Bouy tied down on deck athwartships in position to minimise crane whip on pickup. Bottom of bouy toward Stbd Side. Anchor in stern chute. +++++++++++++++++ Arrive on Station. ++++++++++++++++++++++ =========================== Release and Tow Clear ======== Release old mooring and tow bouy if required. =========================== Deployment =================== Bouy over the Stbd Side using crane on a short whip and the Sur quick release hook. Deploy Nilspin from Pengo. 9 stops to attach Inductive CTD pods. Verify communication with each pod prior to letting wire spool out. This is estimated to add 10 minutes to the deployment time. End of Nilspin Stop and verify operation of T-pods and measure characteristics of deployed cable. Estimate 15minutes. Attach Swivel at end of Nilspin. Spool out nylon and polyo. Attach Balls/Swivel/Release Spool out anchor line. Attach anchor Position over drop site Deploy anchor. ================= Recovery ============================ Come alongside bouy and attach to Trawl Winch thru center block in A-frame. Recover Bouy thru stern a-frame lifting with Trawl Winch Tag from Tower to capstan via deck cleat Bouy fast on deck. Cut chain. Bouy moved to Port? Side with Crane and secured. Recovery of ADCP cage and 10 mtr cage with Pengo winch. Transfer Nilspin below lower cage to Pengo winch. Recover Nilspin stopping 9 times to recover T-pods. Recover top swivel and spool onto pengo. (Might have to stop and remove swivel depending on it's condition) Recover nylon and PolyO Recover Balls/Swivel/Release ++++++++++++++++++ end of ops +++++++++++++++++++++ Return to ML.